My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-15_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2014-04-15_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:10 PM
Creation date
4/15/2014 12:36:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
4/15/2014
Doc Name
Inspection Report
From
DRMS
To
Twentymile Coal Company
Inspection Date
4/10/2014
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 10, 2014 C- 1982 - 056 /Foidel Creek Mine JDM <br />RDA Outslope with Soil Placed <br />Underdrain Outlet <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and Maintenance 4.03. 1(5) and <br />(6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />The RDA haul roads were stable and dry at the time of the inspection with no problems noted. <br />SIGNS AND MARKERS — Rule 4.02: <br />Disturbance area markers and topsoil markers were identified in and around the RDA as required, with the <br />exception of the following: <br />- Topsoil markers at the soil piles to the east of the RDA and to the south of the RDA near Trudy's corner. <br />- Disturbance area markers near the soil piles will need to be located in the boundaries of the disturbance. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.063; Redistribution 4.06.4: <br />Based on this inspection, not all topsoil had been segregated in the area of the underdrain construction access road, <br />the dozer ditch and the RDA -4 ditch. Small piles of organic /rooted material were observed along the disturbances <br />to these locations. This material will be required to be placed in the appropriate topsoil pile. <br />Ditch Construction with T <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.