Laserfiche WebLink
of N. COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT <br />* PHONE: (303) 866 -3567 <br />*1876* <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />MINE /PROSPECTING ID #: <br />MINERAL: <br />COUNTY: <br />Boettcher Sand Stone Quarry <br />M- 1977 -345 <br />Sandstone <br />Larimer <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: <br />INSP. TIME: <br />Monitoring <br />Eric C. Scott <br />April 11, 2014 <br />13:00 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />Holcim (US) Inc. <br />Michael Toelle, Gordon Benton <br />110c - Construction Limited Impact <br />REASON FOR INSPECTION: <br />BOND CALCULATION TYPE: <br />BOND AMOUNT: <br />Normal I &E Program <br />None <br />$10,100.00 <br />DATE OF COMPLAINT: <br />POST INSP. CONTACTS: <br />JOINT INSP. AGENCY: <br />NA <br />None <br />None <br />WEATHER: <br />INS CTOR'S I ATURE: <br />SIGNATURE DATE: <br />Clear <br />April 14, 2014 <br />The following inspection tonics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Reclamation Success <br />PROBLEM /POSSIBLE VIOLATION: Problem: Problem for failure to reclaim site within 5 years after the end of <br />mining activity as required by 34- 32.5- 116(4)(q)(1) of the Act. <br />CORRECTIVE ACTIONS: Permittee will submit a schedule for reclamation to be completed to DRMS by the <br />corrective action date shown. Failure to pursue the completion of reclamation with reasonable diligence will <br />result in a possible violation of the Act as listed above. <br />CORRECTIVE ACTION DUE DATE: 5/30/14 <br />INSPECTION TOPIC: Signs & Markers <br />PROBLEM /POSSIBLE VIOLATION: Problem: The affected area boundary markers are missing or incorrectly <br />placed. This is a problem for failure to maintain boundary markers around the affected area as required by <br />Section 3.1.12(2) of the rule. <br />CORRECTIVE ACTIONS: The operator shall conduct a survey and replace the boundary markers in the correct <br />location(s). The operator shall provide proof to the Division that this has been done by the corrective action <br />date. <br />CORRECTIVE ACTION DUE DATE: 5/30/14 <br />Page 1 of 4 <br />