Laserfiche WebLink
Aft <br />Miscellaneous: <br />Drain cover fill processing continued. <br />Rip rap processing continued. <br />Deliveries: Five (5) truckloads consisting of 60 rolls of 100 mil LLDPE SSMS geomembrane and 40 spools of LDPE 5mm <br />weld rod were delivered to the site, recorded, and inventoried. <br />Total received to date: 204 rolls of 100 -mil smooth LLDPE geomembrane. <br />204 total rolls of 100 -mil LLDPE SSMS geomembrane. <br />270 total spools of LDPE 5mm weld rod. <br />Submitted by: Eric Lorenson Date: 04 -08 -2014 <br />Reviewed By: 4 Date: 04 -08 -2014 <br />Tim Burkhard <br />Project Resident Manager <br />Phone: 719.689.2986 <br />Approved By: y'>zC Date: `T — /Sl <br />CC &V Projects <br />RECEIVEr. <br />APR 14 2014 <br />Division of Reclamation, <br />Mining & Safety <br />Page 4 of 7 Iv1LE2 WE 05 April 2014.doc <br />