Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # OOA <br />BULLDOZER WORK <br />Task description: Back -'ill Berm Associated with SAE #2 <br />Site: Coal Ridge No. 1 Mine <br />Permit Action: Midterm Review 7 <br />PROJECT IDENTIFICATION <br />Task #: 009 State <br />Date: 4/8/2014 County <br />User: SLB <br />Colorado <br />Garfield <br />Agency or organization name: DRMS <br />Page 4 of 17 <br />Permit/Job #: C1984065 <br />Abbreviation: None <br />Filename: 065 -009 <br />HOURLY EQUIPMENT COST <br />Source <br />Initial Volume: <br />Basic Machine: Cat D9T - 9SU <br />Swell factor: <br />1.165 <br />Horsepower: 405 <br />233 LCY <br />Visibility: 1.000 <br />Blade Type: Semi - Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />200 <br />Swell factor: <br />1.165 <br />Loose volume: <br />233 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1243.2 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />5,700 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.000 <br />(CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />Visibility: 1.000 <br />(AVG.) <br />CIRCES Cost Estimating Software <br />