My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-08_REVISION - C1984065
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1984065
>
2014-04-08_REVISION - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:59 PM
Creation date
4/15/2014 8:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Revision
Doc Date
4/8/2014
Doc Name
Cost Estimate
From
DRMS
To
File
Type & Sequence
MT7
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # OOA <br />BULLDOZER WORK <br />Task description: Bachfill Sediment Pond A <br />Site: Coal Ridge No. 1 Mine <br />Permit Action: Midterm Review 7 <br />PROJECT IDENTIFICATION <br />Task #: 006 State <br />Date: 4/8/2014 County <br />User: SLB <br />Colorado <br />Garfield <br />Agency or organization name: DRMS <br />Page 2 of 17 <br />Permit/Job #: C1984065 <br />Abbreviation: None <br />Filename: 065 -006 <br />HOURLY EQUIPMENT COST <br />Source <br />Initial Volume: <br />Basic Machine: Cat D9T - 9SU <br />Swell factor: <br />1.165 <br />Horsepower: 405 <br />12,565 LCY <br />Source of estimated <br />Blade Type: Semi - Universal <br />Source of estimated <br />swell factor: Cat Handbook <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />10,785 <br />Swell factor: <br />1.165 <br />Loose volume: <br />12,565 LCY <br />Source of estimated <br />volume: Plate 4 -1 <br />Source of estimated <br />swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />100 feet <br />1243.2 LCY/hr <br />-10% <br />5,700 feet <br />2,900 lbs/LCY <br />acted fill or embankment 0.9 <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method: 1.000 <br />(GEN.) <br />Visibility: 1.000 <br />(AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.