My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-10_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2014-02-10_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:52 PM
Creation date
4/14/2014 8:45:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
2/10/2014
Doc Name
Adequacy Response Letter
From
Peabody Energy Corp
To
DRMS
Type & Sequence
SL5
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 SOD <br />Payment shall be made per square yard per the appropriate Bid item and is to include all work related <br />to preparation and installation. <br />4.3 FERTILIZER <br />Payment shall be per acre fertilized per the appropriate Bid item and is to include all work related to <br />preparation and fertilizer application. The Contractor shall supply the Engineer with weight tickets <br />for fertilizer used. <br />4.4 MULCH <br />Payment for mulch application shall be per acre mulched per the appropriate Bid item. The <br />Contractor shall supply the Engineer with weight verification for all mulch materials used. Areas not <br />properly mulched or damaged due to the Contractor's negligence, shall be repaired and remulched <br />in an acceptable manner at the Contractor's expense. Mulch removed by circumstances beyond the <br />Contractor's control shall be repaired and remulched as ordered. Payment for this corrective work <br />shall be at the unit Bid price. <br />4.5 TACKIFIER <br />Payment shall be per acre of applied tackifier per the appropriate Bid item and is to include all work <br />related to preparation and tackifier application. The Contractor shall supply the Engineer with tickets <br />for tackifier used. <br />4.6 BONDED FIBER MATRIX <br />Payment shall be per acre of bonded fiber matrix applied per the appropriate Bid item and is to <br />include all work related to preparation and bonded fiber matrix application. The Contractor shall <br />supply the Engineer with tickets for bonded fiber matrix used. <br />4.7 TOPSOIL <br />Payment for respreading and preparing topsoil, if determined under this specification, for reseeding <br />shall be paid made at the contract unit price per cubic yard in place. <br />4.8 LIMITATIONS <br />The Contractor will not be paid for revegetation of disturbed areas which resulted from the <br />Contractor's carelessness or negligence in performing the Work. <br />Revegetation <br />2821 -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.