Laserfiche WebLink
CliClNG C! <br />January 30, 2014 <br />Mr. Roy Karo <br />Reclamation Manager <br />Seneca Coal Company <br />P.O. Box 670 <br />Hayden, CO 81639 <br />State.co.us Executive Branch Mail - Fwd: <br />The Division has reviewed Yoast SL5 bond release application for adequacy: <br />Please find the Division's following commentsaor concerns: <br />1. The application provided a discussion regarding Phase I bond release. However, there is no <br />discussion or detail that provides information to allow the Division to evaluate drainage control on the <br />bond release block in accordance with Rule 3.03.1(3) (a). <br />Please provide: <br />A. A discussion and drawing (or figure) of the sump /stock tank. There is no discussion or depiction of <br />the sump /stock pond located at the south end of the bond release block on the map included with the <br />SL5 application, "Exhibit A" <br />B. Please demonstrate that this sump /stock tank has the appropriate permits from DWR or has <br />been designed in accordance with DWR requirements (i.e. it does not exceed size limitations and <br />has the necessary spillway and /or freeboard.) and meets requirements as applicable to Rule <br />4.05.9(13). <br />C. The map provided by SCC did not include any topographic contours or show the location of the <br />sump /stock tank. Please provide a map or drawing (or figure) that provides adequate topographic <br />detail to allowthe Division to determine runoff direction and identify constructed features, i.e. sump, <br />drainage channel, culverts, etc, Rule 3.03.1(3) (a) and Rule 2.010.36). <br />2. The bond release block has been approved for a post- mining land use of commercial /industrial. <br />However, SCC needs to provide a discussion howthe site has been stabilized and not eroding. If the <br />site or portions thereof have been vegetated, please provide a discussion of what is growing in <br />accordance with Rules 4.15.10 (2) and (3) apply to the bond release block being requested. A <br />statistical analysis is not necessary. Routt County Road and Bridge Department required the <br />contractor that conducted the traffic circle construction to seed the area. Please include a description <br />of table of what species Kere included in the seed mix. <br />Page 2 of 2 January 30, 2014 C1994 -082 SL5 PAR <br />SCC has requested total liability release for the 6.25 acres included in this bond release block. SCC <br />is requesting $16,382.81. In accordance with Rule 3.02.3, the Division will assure that adequate bond <br />remains to complete all remaining tasks, as per Rule 3.03.1(3)(x). . <br />https: / /mai I.g oog Ie.conVmai I /u /0 / ?ui =2 &i Ire29129fcb5 &viev�-- pt &search =i nbox&th= 14560aea853c003f &si ml= 14560aea853c003f 2/3 <br />