Laserfiche WebLink
` , s RECEIVED <br />12014 <br />r 111 Annual Report Division of Reclamation, <br />Mining & Safety <br />Page 2 of 3 <br />Permittee Name: <br />City of Grand Junction <br />Permit Number: <br />M- 2007 -005 <br />Operation Name: <br />Riverside Parkway <br />County: <br />Mesa <br />Annual Fee Due: <br />$504.00 <br />Anniversary Date: <br />February 14, 2014 <br />Permit Acreage: <br />14.70 <br />Current Bond Amt: <br />$0.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />_ inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the _ <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />YES 6CO ) <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES lU <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? SFPr 200`7 <br />5. Does the mine operate more than 180 days per year YES <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES 40 <br />b) approval for INTERMITTENT OPERATION? YES <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. (� <br />9. Number of acres that were reclaimed during the current report year. D <br />10. Estimated new acreage to be affected in the next report year. 0 <br />11. Estimated acres to be reclaimed in the next report year. fig. (o <br />12. Total acres in various staLyes of reclamation, since permitted mining activities began: <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />10.(o <br />seeded w/ <br />Is. CO <br />w /topsoil <br />19. Co <br />mulched w/ <br />19.(0 <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />Z <br />graded: <br />100.& <br />fertilized w/ <br />replacement <br />Ll <br />rate (tons): <br />apvd fertilizer: <br />depth (in.): <br />Ac(tC <br />Seed <br />balLL-Eb <br />Fertilizer <br />wA,-�Q C3ASED <br />Mulch <br />SLowro STQ„w, <br />application <br />�,� yz c g s Ac <br />application <br />P aAY <br />application <br />t 2% r, P� A N b M h ,CN <br />Zoo Ibs / <br />method: <br />method: <br />method: <br />TAcKiF IER ^G <br />