Laserfiche WebLink
April 9, 2014 C- 1996 -083 /13owie No. 2 Mine SLB <br />V, <br />Gob Pile #3 — foreground is <br />material spread for dying. <br />Excavator and haul truck are <br />windrowing material from <br />wash plant for drying. <br />Gob Pile #3 — Ditch J -3 <br />.1 � <br />n <br />gig.`s <br />Number of Partial Inspection this Fiscal Year: 14 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 11 of 14 <br />