Laserfiche WebLink
1�v <br />110c Annual Report <br />REC 7 1VED <br />AP-,,' w � ' 1 ° 4 <br />4SVISION OF "ECLAMATION <br />WAND SAFETY <br />Permittee Name: <br />Delhur Industries, lee. <br />Permit Number: <br />M- 2000 -039 <br />Operation Name, <br />McKenna Limestone <br />Quart <br />County: <br />Huerfano <br />Annual Fee Due: <br />$323.00 <br />Anniversary Date: <br />April 18, 2014 <br />Permit Acreage: <br />9.80 -�- <br />Current Bond Anit: <br />$17,100-00 <br />According to C.R.S. 34-32,5-116 or 34 -32 -116, each year, on the anniversary date of the pennit, an operator shall submit <br />the Annual fee, an Annual Report and Map showing the extent of current disturbance to affected laird, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dales for the beginning of active operations, and ►hc date active operations ceased for the year-. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site, if, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action_ <br />1. is the site identification sign posted in accordance with Mule Cft NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). NO <br />3. Is the none site in fitial reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time llinits related to compltaion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5_ Does the mine operate more than 180 days per year-? YES NO <br />If "NO ", please review Rule 1.13 to assume that your mine: is in compliance. <br />6. Flas this mitre been granted: a) approval of TEMPORARY CESSATION Status? (� NO <br />b) approval for 1N"CLRMITfENT OPERATION? eft <br />7. Number of acres currently aflhcte d (mining + incomplete and or unreleased reclamation). 18.1 <br />8. Number of acres that were newly affected during the current report year. 0 <br />9. Number of acres that were reclaimed during the current report year. 0 <br />10. Estimated new acreage to be affected in the next report year. 0 <br />11. Estimated acres to be reclaimed in lie next report year. 0 <br />............... <br />12. Total acres in various sta es of reclamation since pen nitled iruning activities be pan: <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backliUml: <br />heeded w/ <br />tv /topsoil <br />mulched w/ <br />,approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />_ <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons/ac): <br />a vd fertilizer: <br />depth (in.): <br />Send <br />-T <br />Fertilizer <br />Mu1011 <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />