Laserfiche WebLink
PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />INSPECTOR'S NAME: Chris Miller DATE: 3 -21 -14 <br />NPDES I.D. NO.: CO- 0000221 D.P. 010 <br />FACILITY CONFIGURATION: Cross - Valley Pond DATE LAST INSPECTION: 11 -8 -13 <br />SITE NAME: Pond #011 LOCATION: NE1 /. SW1 /<,Sec. 16, T5N, R87W <br />MINE NAME: Yoast Mine(Seneca Coal Co) LOCATION: 8.5 mi. SE of Hayden, CO <br />MINE I.D. NO.: CMLRD Permit No. C -94 -082 OWNER'S REP.: Roy Karo, Gen Mgr <br />Circle or write in appropriate response <br />1. <br />Foundation preparation (removal of vegetation, stumps, topsoil: <br />Yes <br />2. <br />Lift thickness: <br />8 in. <br />3. <br />Compaction according to approved plan: <br />Yes <br />4. <br />Burning (specify extent and location): <br />No <br />S. <br />Angle of slope: 3.0:1 upstream, 2.8:1 downstream <br />Total = <br />5.8:1 <br />6. <br />*Seepage (specify location, color, and approximate volume) <br />From underdrain pipes: <br />Yes <br />No <br />N/A <br />At isolated points on embankment slopes: <br />Yes <br />No <br />N/A <br />At natural hillside <br />Yes <br />No <br />N/A <br />Over widespread areas: <br />Yes <br />No <br />N/A <br />From downstream foundation area: <br />Yes <br />No <br />N/A <br />"Boils" beneath stream or ponded water: <br />Yes <br />No <br />N/A <br />7. <br />Cracks or scarps on crest: <br />Yes <br />No <br />N/A <br />8. <br />Cracks or scarps on slope: <br />Yes <br />No <br />N/A <br />9. <br />Sloughing or bulging on slope: <br />Yes <br />No <br />N/A <br />10. <br />*Major erosion problems: <br />Yes <br />No <br />N/A <br />11. <br />Surface movements in valley bottom or on hillside: <br />Yes <br />No <br />N/A <br />12. <br />*Erosion of toe: <br />Yes <br />No <br />N/A <br />13. <br />*Water impounded against toe: <br />Yes <br />No <br />N/A <br />14. <br />Existing embankment freeboard: (normal = 5.1') <br />15 <br />feet <br />15. <br />Increase Decrease in water level: no change <br />2 feet <br />16. <br />Cracks, bulging, or erosion on upstream face <br />Yes <br />No <br />N/A <br />17. <br />Visible sumps or sinkholes in slurry surface: <br />Yes <br />No <br />N/A <br />18. <br />*Clogging <br />Spillway channels and pipes: <br />Yes <br />No <br />N/A <br />Decant system: <br />Yes <br />No <br />Diversion ditches: <br />Yes <br />No <br />19. <br />*Cracking or crushing of pipes <br />Spillway pipes: <br />Yes <br />No <br />N/A <br />Decant system: <br />Yes <br />No <br />20. <br />Trash racks clear and in place: <br />Yes <br />No <br />N/A <br />21. <br />Discharge rate (gpm) <br />p <br />*Major <br />adverse changes in these items could cause instability and <br />should <br />be reported <br />to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions <br />noted in these items should normally be described <br />(extent, location, <br />volume, <br />etc.) in the space on the back of this sheet <br />