Laserfiche WebLink
Drilling and Well Completion Information <br />Depth = Feet Measured Depth from Ground Level <br />0.0 -80.0 GL: conductor hole, 26.0" <br />0.0 -80.0 GL: conductor casing, 13.375" OD (steel L /S, 52.7 lb /ft), cement to surface <br />80.0- 1342.0 GL: vertical intermediate hole (9.875" ) to KOP <br />1342.0- 2230.0 GL: directional 9.875" curve portion intermediate hole, average 10° per 100 ft <br />0.0- 2230.0 GL: intermediate casing, 7.625" OD (K -55, 26.4 lb/ft), centralizers every 80 -100 ft <br />0.0- 2230.0 GL: intermediate casing cement, 500 sks Elastiseal V2 lead, 80 sks Varicem tail, <br />2230.0- 2330.0 GL: directional 6.75" horizontal hole to 8H -1 Intercept <br />UWi <br />O <br />A <br />O <br />W <br />O <br />Cl) <br />N <br />O <br />O <br />O <br />N <br />O <br />O <br />N <br />co <br />O <br />O <br />C3 <br />W <br />O <br />O <br />V <br />O <br />0 <br />0 <br />I <br />O <br />0 <br />O <br />0 <br />Drilling and Well Completion Information <br />Depth = Feet Measured Depth from Ground Level <br />0.0 -80.0 GL: conductor hole, 26.0" <br />0.0 -80.0 GL: conductor casing, 13.375" OD (steel L /S, 52.7 lb /ft), cement to surface <br />80.0- 1342.0 GL: vertical intermediate hole (9.875" ) to KOP <br />1342.0- 2230.0 GL: directional 9.875" curve portion intermediate hole, average 10° per 100 ft <br />0.0- 2230.0 GL: intermediate casing, 7.625" OD (K -55, 26.4 lb/ft), centralizers every 80 -100 ft <br />0.0- 2230.0 GL: intermediate casing cement, 500 sks Elastiseal V2 lead, 80 sks Varicem tail, <br />2230.0- 2330.0 GL: directional 6.75" horizontal hole to 8H -1 Intercept <br />UWi <br />O <br />A <br />O <br />W <br />O <br />Cl) <br />N <br />O <br />p <br />O <br />W <br />O <br />O <br />N <br />O <br />O <br />N <br />co <br />O <br />O <br />N <br />O <br />O <br />O <br />0 <br />O <br />0 <br />O <br />O <br />CJ <br />O <br />W <br />O <br />O <br />O <br />O <br />J <br />O <br />South 1000 -1000 5700 <br />Measured Depth <br />(from GL) 1100 1100 5600 <br />GL: 6691.6' ungraded <br />KB: 6702.6' est <br />1200 1200 5500 <br />Kick -Off Point <br />1342.0 GL 1300 5400 <br />1300 - <br />A -Gry <br />Non_ 1400 5300 <br />R -7 <br />Measured Depth GL r500 15oo 5200 <br />B -Gry - <br />76.0 <br />9.875" Directional Hole ° 7600 5100 <br />1342.0- 2230.0 GL - <br />Casing Point (Build Rate: 10 °/100) 7� ` R -s <br />6.75" Directional Hole 2230.0 GL °° �7 Measured Depth KB <br />2230.0- 2330.0 GL (88.5 Inclination) X00 5000 <br />(8H -1 Intercept) -70 _ <br />0 <br />'D00 L -5 4900 <br />% l <br />0 c9 - <br />N O 00 - <br />N N N N O L -5 <br />N <br />o° <br />0 0 0 CD CD <br />0 ° 4800 <br />„ <br />- - - - -- N <br />PQ <br />O O O O C O <br />O O O - <br />4700 <br />Projected Drill Path Upper Boies Bed <br />(2' above Base of LBB) OSMB <br />4600 <br />Lower Boies Bed Well Path From SDI, 8H -R Plan 1 - <br />dip angle: 1.3 degrees - <br />8H -R - 4500 <br />Elevation, ft <br />Natural Soda, Inc. <br />8H -R Schematic Well Prognosis <br />Section 35, T1S, R98W Rio Blanco County, CO <br />Daub &Associates, Inc. __11111` Date: January 9, 2014 <br />