Laserfiche WebLink
12. Primary future (Post - mining) land use (check one): <br />13 <br />" Cropland(CR) ILI Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />DResidential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />Cropland(CR) • Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />-4- <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial /Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial /Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />N /A. We will be filling a lake which has formed following completion of mining operations <br />15. On Site Processine: -, Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />N /A. We will be filling a lake which has formed following completion of mining operations <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />NIA <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />We will be flllina a lake which has formed following completion of minina operations around <br />1990. We will use inert fill material from the adjacent Brannan Pit 29 on the other side of Nome <br />StFeet. We will use a eenyeyeF belt system inside a pFepesed eeneFete bex eUlyeFt URdeFReath--- <br />Nome Street (Connector road from US -85 to E-470) to transport the fill material to the lake area. <br />Once the Tilling operation is complete, we will remove the conveyor belt system and till e bOX <br />culvert with concrete. We will re- vegetate any disturbed areas with native seed. <br />