Laserfiche WebLink
Table 1: Final Reclamation Description by Phase and Parcel for the Evans Pit #2 M- 2000 -041 <br />Phase <br />Parcel <br />Acres <br />Final Reclamation <br />I <br />1 <br />12 <br />Open space <br />I <br />2 <br />9 <br />O en s ace <br />I <br />3 <br />25 <br />Open space <br />I <br />4 <br />96 <br />Lined water storage <br />II <br />5 <br />30 <br />O en s ace <br />II <br />6 <br />8 <br />Reservoir bank <br />III <br />3,030.94 <br />194 <br />Lined water storage <br />Subtotal <br />Buffer <br />Zone <br />75 <br />Undisturbed <br />Table 2: Reclamation cost estimate for Phase 1 Parcels 1, 2 and 3. <br />Direct Tasks Unit <br />Removal of powerline C <br />Applying 6 inches of topsoil <br />acre <br />Backfilling Phase 2 <br />Quantity Cost <br />Total Cost <br />$ 5,000.00 <br />46 1 $1,17934 1 $ 54,249-641 <br />d' <br />1 58,000 <br />1 $ 0.70 IS <br />40,600.00 <br />Seeding <br />Fertilizing acre <br />46 <br />$ 87.56 <br />$ <br />4,027.76 <br />Tilling acre <br />46 <br />$ 98.01 <br />$ <br />4,508.46 <br />Seeding acre <br />46 <br />$ 88.20 <br />$ <br />4,05710 <br />Mulch acre <br />46 <br />$ 65.89 <br />$ <br />3,030.94 <br />Subtotal <br />$ <br />15,624.36 <br />Mobilization fee hours <br />1 <br />$ 700.00 <br />$ <br />700.00 <br />Direct Expenses Total <br />$ <br />75,574.00 <br />Indirect Tasks <br />Liability insurance <br />0.0202 <br />$ <br />1,526.59 <br />Performance bond <br />0.0105 <br />$ <br />793.53 <br />Profit <br />0.1 <br />$ <br />7,557.40 <br />Job Superintendent <br />20 <br />$ 45.00 <br />$ <br />900.00 <br />Subtotal <br />$ <br />10,777.52 <br />Miscellaneous indirect <br />0.0925 <br />$ <br />7,987.52 <br />Total Bond <br />S <br />94,339.04 <br />Page 3 of 6 <br />