Laserfiche WebLink
Arw %rJ 1 -ce <br />vrtkG A-n M - <br />�- 11t <br />112c Annual Report <br />Page 2 of 3 <br />RECE1VEE® <br />Permittee Name <br />Louisiana Land and Gravel <br />Company, LLC <br />Permit Number. <br />M-2000-049 AFN W3 /UN <br />Operation Name: <br />Angie Pit <br />County. <br />Montrose t- HKLAMA <br />Annual Fee Due <br />$791 00 <br />Anniversary Date. <br />April 9, 2014 <br />Permit Acreage: <br />15400 <br />Current Bond Amt: <br />$103,365.00 <br />LION <br />J <br />According to C R S 34 -32 5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in tlus report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action <br />1 <br />Is the site identification sign posted in accordance with Rule 3 1 12(1) <br />� NO <br />2 <br />Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />YES) NO <br />3. <br />Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO) <br />backfilled. <br />If "YES," please note time limits related to completion of reclamation, Rule 3 1 3 <br />seeded w/ <br />4 <br />What was the date of last excavation, processing or hauling activity at the mine? <br />12/ 1 1 <br />5 <br />Does the mine operate more than 180 days per year9 <br />YES <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance- <br />6 <br />Has this mine been granted a) approval of TEMPORARY CESSATION Status? <br />Y,�ES•� d <br />b) approval for INTERMITTENT OPERATION? <br />E NO <br />7 <br />Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />Zc) <br />8. <br />Number of acres that were newly affected during the current report year. <br />9. <br />Number of acres that were reclaimed during the current report year. <br />fertilized w/ <br />10. <br />Estimated new acreage to be affected in the next report year <br />11. <br />Estimated acres to be reclaimed in the next report year <br />D <br />12. <br />Total acres in various stages of reclamation, since permitted mining activities began <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled. <br />seeded w/ <br />3 <br />w /topsoil <br />mulched w/ <br />O <br />approved mix <br />replaced. <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />T <br />D <br />Mulch application <br />graded <br />fertilized w/ <br />C, <br />replacement <br />rate (tons /ac): <br />b <br />apvd fertilizer. <br />depth (m.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />` <br />application <br />` <br />laC LC,6 -;V <br />application <br />method <br />Fib C ^ <br />method. <br />method: <br />