Laserfiche WebLink
a1112O <br />CQA ACTIVITIES: <br />I) Field Activities: Observation of construction activities during this reporting period included: Slope grading and fill <br />placement; Ambient and fill temperature monitoring and recording; Underground working remediation; Production <br />drilling and blasting; Closure drain installation; 1/2:1 grout placement and testing, SF, DCF and SLF processing; 100 -mil <br />LLDPE SSMS geomembrane and LDPE 5mm weld rod delivery and inventory. <br />llt Laboratory Activities: Laboratory testing continued with Permeability, Parficle Size Distribution, Atterberg Limits, <br />Moisture - Density relationships, gradations, material classification, identifications, and field material sampling were <br />performed during this reporting period. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Structural fill sample numbers SF46R through SF -51R <br />Drain Cover Fill sample numbers DCF 65 and DCF 66 <br />Soil Liner Fill sample numbers SLF 125 -5 through SLF 128 -S <br />Cast grout cubes for strength testing from the %:1 slope <br />Note: Samples labeled with the suffix "R" are samples of Record 1 QA samples; those without are QC samples. <br />General Project Items <br />Meetings and Discussions: The Contractor Meeting occurred on March 26, 2014 with CC &V Projects, AMEC, and Ames. <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, AMEC, and Ames. <br />Miscellaneous: <br />Closure drain installation completed by AK Drilling at the bottom of the PSSA. <br />Drain cover fill processing continued. <br />Rip rap processing continued. <br />Deliveries: One (1) truckload consisting of 12 rolls of 100 mil LLDPE SSMS geomembrane and 20 spools of LDPE 5mm <br />weld rod were delivered to the site, recorded, and inventoried. <br />Total received to date: 204 rolls of 100-mil smooth LLDPE geomembrane. <br />144 total rolls of 100 -mil LLDPE SSMS geomembrane. <br />230 total spools of LOPE 5mm weld rod. <br />Submitted by: <br />Bobby Redd, El <br />Reviewed By: t <br />Tim Burkhard <br />Project Resident Manager <br />Phone: 717.6F^ ^ ^ °` <br />Approved By: <br />CC &V Projeca <br />Page 3 of 6 <br />Date: 04 -01 -2014 <br />Date: 04 -02 -2014 <br />Date: `z_ -J4 <br />MLE2 WE 29 March 2014.doc <br />