a/f)fC� <br />CRIPPLE CREEK & VICTOR GOLD MIMNG Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weekly Report <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Numb« Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125N0. * * *'•' * ** 29 March 2014 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Ames Construction Co. Inc. <br />Reporting Period: 3.23.14 through 3.29.14 <br />Days <br />S <br />M <br />I T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />DID <br />D <br />D <br />D <br />D <br />N <br />N <br />I N <br />I - <br />- <br />- <br />r-1 <br />D = D!X Shift N = Ni t Shift W = Weather Da <br />Ambient Temperature Ranges for reporting period: Weather conditions for reporting period: <br />Low: 1 to 27°17 Cloud Cover: Partly cloudy. <br />High: 26°F to 51"F Precipitation: Light Snow Thursday, March 27, 2014 <br />Wind: Variable <br />Ames: Continuing construction tasks for the VLF <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) VLF (PSSA, Phase I, Phase II) <br />Topsoil I Overburden Stripping: No topsoil stripping occurred; however, Cat and John Deere dozers shaped and <br />packed the slopes of the Area 34 Topsoil Stockpile. <br />Production drilling: Production drilling occurred within the VLF limits. <br />Production blasting: Five (5) production blasts occurred within the VLF. <br />Structural Fill: <br />A Cat 992 loader removed material from near STA A14 +00 to A20 +00 and 810 +00 to B16+00. The material was <br />hauled to the ADR haul road fill; between STA H23 +00 and H30 +00 and in the buttress fill area adjacent to Dump 4, <br />in 777 haul trucks and was placed as structural fill by Cat dozers. Cat dozers also cut material from the slopes <br />above the ADR Haul Road fill areas. The material was pushed down to the fill area, placed as structural fill and <br />compacted per the project specification. <br />A John Deere 850 excavator removed material from the %:1 slope. This material was transported to the rip rap <br />plant for processing using Cat 740 haul trucks. <br />A John Deere 870 excavator removed material from STA A20 +00 to A21 +00, STA C2 +00 and STA 15 +00 of the <br />ADR haul road. This material was transported using Cat 740 haul trucks for placement as structural fill in the <br />buttress fill location. The structural fill was placed and compacted per method specification. <br />Page I of 6 MI.E2 WE 29 March 2014.doc <br />