My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-07_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-04-07_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:55 PM
Creation date
4/9/2014 3:45:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/7/2014
Doc Name
Weekly construction quality assurance report week ending 3/29/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a/f)fC� <br />CRIPPLE CREEK & VICTOR GOLD MIMNG Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weekly Report <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Numb« Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125N0. * * *'•' * ** 29 March 2014 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Ames Construction Co. Inc. <br />Reporting Period: 3.23.14 through 3.29.14 <br />Days <br />S <br />M <br />I T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />DID <br />D <br />D <br />D <br />D <br />N <br />N <br />I N <br />I - <br />- <br />- <br />r-1 <br />D = D!X Shift N = Ni t Shift W = Weather Da <br />Ambient Temperature Ranges for reporting period: Weather conditions for reporting period: <br />Low: 1 to 27°17 Cloud Cover: Partly cloudy. <br />High: 26°F to 51"F Precipitation: Light Snow Thursday, March 27, 2014 <br />Wind: Variable <br />Ames: Continuing construction tasks for the VLF <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) VLF (PSSA, Phase I, Phase II) <br />Topsoil I Overburden Stripping: No topsoil stripping occurred; however, Cat and John Deere dozers shaped and <br />packed the slopes of the Area 34 Topsoil Stockpile. <br />Production drilling: Production drilling occurred within the VLF limits. <br />Production blasting: Five (5) production blasts occurred within the VLF. <br />Structural Fill: <br />A Cat 992 loader removed material from near STA A14 +00 to A20 +00 and 810 +00 to B16+00. The material was <br />hauled to the ADR haul road fill; between STA H23 +00 and H30 +00 and in the buttress fill area adjacent to Dump 4, <br />in 777 haul trucks and was placed as structural fill by Cat dozers. Cat dozers also cut material from the slopes <br />above the ADR Haul Road fill areas. The material was pushed down to the fill area, placed as structural fill and <br />compacted per the project specification. <br />A John Deere 850 excavator removed material from the %:1 slope. This material was transported to the rip rap <br />plant for processing using Cat 740 haul trucks. <br />A John Deere 870 excavator removed material from STA A20 +00 to A21 +00, STA C2 +00 and STA 15 +00 of the <br />ADR haul road. This material was transported using Cat 740 haul trucks for placement as structural fill in the <br />buttress fill location. The structural fill was placed and compacted per method specification. <br />Page I of 6 MI.E2 WE 29 March 2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.