My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-04_PERMIT FILE - M2014017
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014017
>
2014-04-04_PERMIT FILE - M2014017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:52 PM
Creation date
4/8/2014 12:15:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014017
IBM Index Class Name
PERMIT FILE
Doc Date
4/4/2014
Doc Name
Application
From
Mark Krivanek
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Reclamation. Describe the annual and final reclamation standards based on the anticipated schedule for construction, <br />operations, and project closure. Include such items as the removal of structures and facilities including bridges and culverts, a <br />revegetation plan, permanent containment of mine tailings, waste, or sludges which pose a threat of a release into the environment, <br />closing ponds and eliminating standing water, a final surface shaping plan, and post operations monitoring and maintenance plans. <br />Gr�r�v <br />I., w,, �d ��- P; f-� �v,— .2,�,��� �1 �, �,�r w�4 <br />c�l.Qn,4,, vq be. sPdt,�,/ hJ Lv <br />vk.0 Clx CIA <br />VI. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br />A. Required changes /modifications /special mitigation for plan of operations: <br />B. Bond. Reclamation of all disturbances connected with this plan of operations is covered by Reclamation <br />Performance Bond No. , dated (mm /dd /yy) , signed by (Principal) and (Surety), for the <br />penal sum of . This Reclamation Performance Bond is a guarantee of faithful performance with the terms and <br />conditions listed below, and with the reclamation requirements agreed upon in the plan of operations. This <br />Reclamation Performance Bond also extends to and includes any unauthorized activities conducted in connection <br />with this operation. <br />The bond amount for this Reclamation Performance Bond was based on a bond calculation worksheet. The bond amount may be <br />adjusted during the term of this proposed plan of operations in response to changes in the operations or to changes in the economy. <br />Both the Reclamation Performance Bond and the bond calculation worksheet are attached to and made part of this plan of <br />operations. Acceptable bond securities (subject to change) include: <br />1. Negotiable Treasury bills and notes which are unconditionally guaranteed as to both principle and interest in an amount <br />equal at their par value to the penal sum of the bond, or <br />2. Certified or cashier's check, bank draft, Post Office money order, cash, assigned certificate of deposit, assigned savings <br />account, blanket bond, or an irrevocable letter of credit equal to the penal sum of the bond. <br />(If more space is needed to fill out a block of information, use additional sheets and attach form) <br />1.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.