My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-04_PERMIT FILE - M2014017
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014017
>
2014-04-04_PERMIT FILE - M2014017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:52 PM
Creation date
4/8/2014 12:15:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014017
IBM Index Class Name
PERMIT FILE
Doc Date
4/4/2014
Doc Name
Application
From
Mark Krivanek
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br />Reclamation Plan: Partial reclamation will occur at the end of each mining season during mining <br />operations, as is feasible. The natural slopes o n the site are significantly steeper that a 3:1 grade. To <br />maintain the natural aspects of the alpine environment and to reduce the impact of post — mining <br />grading, the slopes will be reclaimed as an approximation to the natural pre- mining slope grades. After <br />mining is completed, excavations and dig sites will be filled with remaining overburden and topsoil as <br />available. As recommended by the Western Native Seed company, the recommended seed mix would <br />be slender wheat grass at 20 lbs. per acre. <br />Reclamations Cost: The cost estimate is based on the maximum excavation and disturbance at any <br />possible time (worst case). Worst Case: 2 acres disturbed, overburden and topsoil stockpiled on the <br />work benches near dig areas. Roads or trails will be created that will need to be reclaimed. <br />Mobilization of work crews: 2 hrs. each way x 2 men at $25 /hr. for 7 days: $1400.00 <br />Backfill excavations: 2 men x 8hrs /daffy at $40 /hr for 5 days: $3200.00 <br />Spread topsoil by hand: 2 men x 8 hrs /day at $40 /hr for 1 day: $640.00 <br />Seeding Materials: 20lbs. per acre x 2 acres at $5.401b.: $216.00 <br />Broadcasting Seeding: 2 men x 8 hrs /day at $40 /hr for 1 day: $640.00 <br />Total Estimated Reclamation Cost: $5456.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.