Exhibit D <br />Reclamation Plan: Partial reclamation will occur at the end of each mining season during mining <br />operations, as is feasible. The natural slopes o n the site are significantly steeper that a 3:1 grade. To <br />maintain the natural aspects of the alpine environment and to reduce the impact of post — mining <br />grading, the slopes will be reclaimed as an approximation to the natural pre- mining slope grades. After <br />mining is completed, excavations and dig sites will be filled with remaining overburden and topsoil as <br />available. As recommended by the Western Native Seed company, the recommended seed mix would <br />be slender wheat grass at 20 lbs. per acre. <br />Reclamations Cost: The cost estimate is based on the maximum excavation and disturbance at any <br />possible time (worst case). Worst Case: 2 acres disturbed, overburden and topsoil stockpiled on the <br />work benches near dig areas. Roads or trails will be created that will need to be reclaimed. <br />Mobilization of work crews: 2 hrs. each way x 2 men at $25 /hr. for 7 days: $1400.00 <br />Backfill excavations: 2 men x 8hrs /daffy at $40 /hr for 5 days: $3200.00 <br />Spread topsoil by hand: 2 men x 8 hrs /day at $40 /hr for 1 day: $640.00 <br />Seeding Materials: 20lbs. per acre x 2 acres at $5.401b.: $216.00 <br />Broadcasting Seeding: 2 men x 8 hrs /day at $40 /hr for 1 day: $640.00 <br />Total Estimated Reclamation Cost: $5456.00 <br />