Laserfiche WebLink
-4- <br />12. Primary future (Post - mining) land use (check one <br />Cropland(CR) I_ Pastureland(PL) <br />Rangeland(RL)— Forestry(FR) <br />II Residential(RS) I Recreation(RC) <br />_ Developed Water Resources(WR) <br />13 Primary present land use (check one): <br />_ Cropland(CR) Pastureland(PL) <br />1 _ Rangeland(RL) ( Forestry(FR) <br />Residential(RS) __ Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />_ Industrial /Commercial(IC) <br />----- Solid Waste Disposal(WD) <br />_ General Agriculture(GA) <br />I Wildlife Habltat(WL) <br />_ ✓_ Industrial /Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck /shovel): <br />Front end loaders remove material and load into trucks for hauling to processing plant. <br />15. On Site Processing: ✓ Crushing /Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Limited if found to be feasible or material will be removed <br />and stockpiled as nit run and moved to n another mine for nrocessino <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />This amendment adds 15.36 acres to the permit area. The mining methods do not change. The final end use is <br />changed to developed water storage with possible residential and other uses. <br />