My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-04_INSPECTION - C1981012
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981012
>
2014-04-04_INSPECTION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:51 PM
Creation date
4/8/2014 7:32:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Date
4/4/2014
Doc Name
Inspection Report
From
DRMS
To
New Elk Coal Company, LLC
Inspection Date
3/18/2014
Email Name
LDS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 18, 2014 C- 1981- 012/New Elk Mine LDS <br />GENERAL MINE PLAN COMPLIANCE: <br />Several permitting actions are in progress: <br />• TR68 (which is a response to MT6). The proposed decision due date has been extended to April <br />30, 2014. The Division has received a response to the adequacy letters of November 27, 2013 & <br />January 24, 2014, and is in the process of reviewing it. <br />• TR69 (which is to abate NOV CV 2013 -009). An initial adequacy review of was sent to NECC on <br />April 3, 2014. The proposed decision due date is April 29, 2014 <br />• RN6 has been found complete, but can't be reviewed for adequacy until TR68 has been approved <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3); Drainage 4.03.1(4)/4.03.2(4); Surfacing and Maintenance4.03.1(5) and <br />(6)/4.03.2(5) and (6); Reclamation 4.03.1(7)/4.03.2(7): <br />NECC intends to use the RDA access road as a haul road and had largely completed on- the - ground <br />improvements to the road. A design for a haul road had previously been approved via TR66. TR66 specified that <br />the constructed road must be certified by a Professional Engineer before it could be used as a haul road. However, <br />the as -built road differs significantly from the approved design, so a revision with the new design will need to be <br />approved before the road can be certified and put to use. <br />Work had been completed on the light use road beside the RDA conveyor. The road was passable by car <br />and included a water bar across it to divert run -off towards C41. <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />The notes from the meeting held on March 18th are copied at the end of this document <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 4 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.