My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-07_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-04-07_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:55 PM
Creation date
4/7/2014 2:02:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
4/7/2014
Doc Name
Reclamation Cost Estimate (Emailed)
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
TR86
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C 1996083 Technical Revision No. 86 Page 6 of 9 <br />BULLDOZER WORK <br />Task description: Re- topsoil 10 GVB, 3 Exploration holes pads <br />Site: Bowie No. 2 Mine Permit Action: Technical Revision 86 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 360 State <br />Date: 4/7/2014 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial Volume: 14,447 <br />Swell factor: 1.125 <br />Loose volume: 16.253 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />20% <br />DRMS - 0.75' over 11.94 acres <br />Cat Handbook <br />100 feet <br />1,243.2 LCY/hr <br />Consolidated stockpile 1.0 <br />7,725 feet <br />2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Abbreviation: None <br />Filename: C083 -360 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />1.000 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />(GEN.) <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Initial Volume: 14,447 <br />Swell factor: 1.125 <br />Loose volume: 16.253 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />20% <br />DRMS - 0.75' over 11.94 acres <br />Cat Handbook <br />100 feet <br />1,243.2 LCY/hr <br />Consolidated stockpile 1.0 <br />7,725 feet <br />2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Abbreviation: None <br />Filename: C083 -360 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />1.000 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.