My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-07_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-04-07_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:55 PM
Creation date
4/7/2014 2:02:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
4/7/2014
Doc Name
Reclamation Cost Estimate (Emailed)
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
TR86
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Bowie No. 2 Mine <br />of all costs for TR -86 <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 4/7/2014 <br />User: SLB <br />COST SUMMARY WORK <br />Permit Action: Technical <br />Revision 86 <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit /Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -00i <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />358 <br />359 <br />360 <br />361 <br />Seal 10 GVB and 3 Exploration Holes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />156 <br />$119,069.94 <br />$44,156.45 <br />$13,320.34 <br />$23,375.44 <br />Regrade GVB /exploration hole pads and roads <br />DOZER <br />177.04 <br />Re- topsoil 10 GVB, 3 Exploration holes pads <br />DOZER <br />53.41 <br />Reseed road and pads for GVBs, exploration, and <br />wells <br />REVEGE <br />17.00 <br />SUBTOTALS: <br />403.45 <br />$199,922.17 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />$4,038.43 <br />$2,099.18 <br />$0.00 <br />$19,992.22 <br />$26,129.83 <br />$226,052.00 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.00% <br />Total = <br />$9,042.08 <br />Reclamation management and /or administration: <br />3.13% <br />$7,075.43 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$42,247.34 <br />TOTAL BOND <br />AMOUNT (direct + indirect) = <br />$242,169.51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.