Laserfiche WebLink
Page 4 of 9 <br />BULLDOZER WORK <br />Task description: Re- topsoil 6 GVBs, 1 Exploration hole, 2 Monitoring Well pad <br />Site: Bowie No. 2 Mine Permit Action: Technical Revision 78 Permit/Job #: C 1996083 <br />PROJECT IDENTIFICATION <br />Task #: 344 State: <br />Date: 5/15/2013 County: <br />User: SLB <br />Agency or organization name <br />HOURLY EQL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Colorado <br />Delta <br />DRMS <br />Abbreviation: None <br />Filename: C083 -344 <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Initial Volume: 10,019 <br />Swell factor: 1.12 <br />Loose volume: 11.271 LCY <br />Source of estimated volume: DRMS - 0.75' over 8.28 acres <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,243.2 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 20% <br />Average site altitude: 7,725 feet <br />Material weight 2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Initial Volume: 10,019 <br />Swell factor: 1.12 <br />Loose volume: 11.271 LCY <br />Source of estimated volume: DRMS - 0.75' over 8.28 acres <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,243.2 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 20% <br />Average site altitude: 7,725 feet <br />Material weight 2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.70 <br />(AVG.) <br />Material consistency: 1.000 <br />(CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />