Laserfiche WebLink
Bowie Resources, LLC <br />MR -146 Pitkin Mesa Pipeline <br />Stipulation No. 31 - Prior to removal of topsoil along the Pitkin Mesa pipeline, all snow in the <br />topsoil removal area shall removed. Topsoil may not be removed if ground conditions are <br />wet or snowy. Photographic documentation of conditions at topsoil removal shall be <br />recorded and submitted to the Division. <br />The following pictures satisfy Stipulation No. 31. <br />