My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-03_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2014-04-03_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:50 PM
Creation date
4/4/2014 12:43:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
4/3/2014
Doc Name
Clarification of Midterm Review No 6 (Emailed)
From
DRMS
To
Ben Moline
Type & Sequence
MT6
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/4/2014 State.co.us Executive Branch Mail - Fwd: Keenesburg Strip Mine; C- 1981 -028; Midterm Re\iew No. 6 <br />Good morning Ben, <br />Both items are very good observations. The Division calculates the estimate under the assumption that we <br />would have to hire a contractor to conduct the work and we attempt to pick equipment that would be the most <br />efficient and it does not always match what an operator has on site actually conducting the work. Using our <br />cost estimating software, I changed the scraper to a Cat 627 and there was a significant cost increase for each <br />of the tasks, given this I would prefer to use the Cat 637. <br />In regards to Area 25, the Division releases the financial liability for topsoiling costs once an area has been <br />approved for Phase II bond release. Once Area 25 has been approved for Phase II bond release the Division <br />can release the liability for that task. <br />Please let me know if this explanation is sufficient and if you have any more questions. <br />Thanks, <br />Jared <br />On Thu, Apr 3, 2014 at 10:21 AM, Moline, Ben <Ben.Moline molsoncoors.com> wrote: <br />Thanks forth e midterm review. After reviewing the cost estimate with Danny, there are 2 corrections <br />that should be considered. <br />1—Our scraper is a Cat 627, vs. a Cat 637. This is part of the estimate in Part 3. There is a capacity <br />difference, ours is smaller. <br />2—On page 5 of Part 2, to clarify, Parcel 25 already has topsand and this work will not need to be <br />performed in the future. <br />VTM <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i Ire29129fcb5 &view = pt &search =i nbox&th= 145292022563bf69 &si ml= 145292022563bf69 2/5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.