Laserfiche WebLink
-4- <br />Cropland(CR) <br />X Rangeland(RL) <br />Pastureland(PL) <br />Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. PrimnEX present land use (check onel: <br />Cropland(CR) <br />X Rangeland(RL) <br />Pastureland(PL) <br />Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/COmmercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining Briefly explain mining method (e.g. truck/shovel): Scraper, dozer, dump truck, excavator, or loader to <br />remove and stockpile topsoil. Process sand and gravel by crushing, screening, and or refining. <br />15. On Site Processing: same as original Permit #M -1997 -039 <br />13.1 Briefly explain mining method (e.g. truck/shovel): Dozers, loaders, dump trucks, excavators,or scrapers will be used for <br />stripping topsoil and stockpiling Loaders or excavtors and necessary equipment will beused to process and refine material to be <br />List any designated chemicals or acid- producing materials to be used or stored within permit area: Chemicals used will be only <br />those necessary to mine different types of asphalt or concrete. Fertilizer will be those recommended by those qualified to stabilize <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Conversion from Limited (110) to Regular (112) will be for a continuous flow of mining operations starting with the existing pit <br />and moving south into Stage 1 and continuing to Stage 35 with the goal of never having more than 10 acres of land exposed at <br />any given time with 5 acres in reclamation, 5 acres in stockpiling and processing and 5 acres in mining, as described in the new <br />mining plan Exhibit D. <br />