Laserfiche WebLink
4/3/2014 State.co.us Eecutive Branch Mail - Re: TR69 and CV2013 -009 <br />4. Go through the adequacy review process, until the decision to approve can be proposed <br />5. Allow a 30 day public comment period <br />6. TR69 will be approved (assuming no public comments) <br />7. Ensure that the ditch is constructed in accordance with the new design <br />8. The violation will be abated <br />hope that makes sense. Please contact me if you have any questions or problems, <br />Leigh <br />308 866 3567 (8121) <br />tr69 adequacy 1.pdf <br />258K <br />https: / /mai l.g oog le.com/mai I /u /0 / ?ui =2 &i Ire29129fcb5 &�iev�-- pt &search =i nbox&th= 14528a7b145cf673 &si ml= 14528a7b145cf673 4/4 <br />