Laserfiche WebLink
4/3/2014 State.co.us Executive Branch Mail - Re: Diversion ditch design <br />• survey the entire length of the ditch to allow comparison of the constructed ditch with the <br />approved design. <br />NECC has completed both abatement actions and sent me the results of their survey. I have not yet <br />studied the results or compared them with the permit. It would be helpful for me to work with another <br />specialist from our team who has more experience with ditch design to use the survey results and <br />determine: <br />• if the ditch is constructed in accordance with the approved design; <br />• if the design is adequate; <br />• if and how we will require NECC to alter the ditch. <br />Thanks, <br />Leigh <br />Leigh Simmons <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />303 866 3567 (8121) <br />Susan L. Burgmaier <br />l Protection Specialist <br />Coat Regutatory Program <br />Department of Natural Resources <br />P 303.866,3567 x 8111 I F303.832.8106 <br />1313 Sherman Street, Room 215, Denver, CO 80203 <br />susan.burgmaier@state , co,us I http- / /mining.state.co.us <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i Ire29129fcb5 &view pt &search =i nbox&th= 14524a4b6f3df26a &si ml= 14524a4b6f3df26a 3/4 <br />