Laserfiche WebLink
Table No. 2 <br />R.M. Hiner Construction Co., Inc. <br />Greeley Pit (M- 1977 -151) <br />Moisture Content of Product = <br />Water Used for Dust Control = <br />Sand & Gravel Specific Weight = <br />Sand &Gravel Porosity= <br />4% <br />1.0 <br />125 <br />45 <br />Operational Consumptive Use (aka Operation CU) <br />From Minine <br />Applegate <br />Group, <br />by weight <br />acre -foot per year <br />lb /ft3 (http://www.reade.com/Particle_Briefings/spec_gra2.html) <br />(estimated by operator) <br />Date Revised: 3/3/2014 <br />AG Job #: 09 -131 <br />Month <br />Monthly <br />Production <br />[tons] <br />(A) <br />Water Retained <br />in Product <br />[ac -ft] <br />(B) <br />Intermittent_ <br />Fill Volume - <br />[ac -ft] <br />(C) <br />Wtiter_Used <br />for Dust Control - _ <br />[ac -ft] <br />(D) <br />CU'_ <br />[ac -ft] <br />(E) <br />Apr -14 <br />0 <br />0.00 <br />0.00 <br />0.10 <br />0.10 <br />May -14 <br />0 <br />0.00 <br />0.00 <br />0.15 <br />0.15 <br />Jun -14 <br />0 <br />0.00 <br />0.00 <br />0.20 <br />0.20 <br />Jul -14 <br />0 <br />0.00 <br />0.00 <br />0.25 <br />0.25 <br />Aug -14 <br />0 <br />0.00 <br />0.00 <br />0.20 <br />0.20 <br />5ep -14 <br />0 <br />0.00 <br />0.00 <br />0.10 <br />0.10 <br />Oct -14 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Nov -14 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Dec -14 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Jan -15 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Feb -15 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Mar -15 <br />0 <br />0.00 <br />1 0.00 <br />0.00 <br />0.00 <br />Total <br />0 <br />0.00 <br />1 0.00 <br />1.00 <br />1.00 <br />Notes: <br />(A) Estimated monthly production volumes provided by operator <br />(B) Water Retained in Product = [(Moisture Content of Product)' (A) " 2000) / (62.4' 43560) <br />(C) Intermittent Fill Volume = (Volume of Mined Material) x (1- Porosity) - (B). Mine material volume estimated using specific weight of material. <br />(D) Water Used for Dust Control Is estimated to be 1 acre -foot per year and is distributed according to monthly production volumes <br />(E) Operation CU = (B) + (C) + (D) <br />APR 02 2014 <br />Division of keclarnation <br />Mining & Safety <br />N: \09131 Rex Hiner - Greeley Pit SWSP \Disciplines (Technical) \WRPM \Water Rights \SWSP \2014 SWSP \Greeley Pit 2014 SWSP.xlsx <br />