My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-01_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-04-01_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:44 PM
Creation date
4/1/2014 2:15:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
4/1/2014
Doc Name
Adequacy Response #3
From
J. E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR77
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WE mommigoommu� ME <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />March 26, 2014 <br />Susan Burgmaier <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Technical Revision #77, Substitute Topsoil Plan � 214 <br />Adequacy Response #3 A►V <br />Permit C- 1996 -083 ��`�l <br />�1D <br />Dear Ms. Burgmaier: <br />The DRMS' letter dated February 10, 2014 requested additional information. On behalf <br />of Bowie Resources, LLC, enclosed is the requested data. <br />1. DRMS /BOW2: Item resolved. <br />2. DRMS /BOW2: Item resolved. <br />3. DRMS /BOW2: Item resolved. <br />4. DRMS /BOW2: Item resolved. <br />61 <br />a. Item resolved. <br />b. BRL, with revised Map 32 and Appendix A of Volume IX, has provided locations and <br />volumes of material stockpiles, as requested by the Division. <br />i. Appendix A indicates that there is a total of 263,719 cy of cover material <br />available for reclamation of the gob piles. Included in that figure is the material <br />that has been placed on Gob Pile #1, and Benches #1 and #2/ #3/#4 of Gob Pile <br />#2. The material placed on those areas was placed at a depth of 4'. The revised <br />proposal is to place 3.5' of cover on all of the gob areas. BRL presents a <br />calculation to demonstrate that a total of 263,135 cy of cover material will be <br />required to cover the gob piles at a depth of 3.5'. Unless BRL is proposing to <br />remove and relocate the upper 6" of material on Gob Pile #1 and Benches #1 and <br />
The URL can be used to link to this page
Your browser does not support the video tag.