Laserfiche WebLink
legal settlement. <br />Topsoil /Subsoil Balance (CY) <br />Mixed Topsoil' <br />Lift A Topsoil <br />Lift B Topsoil <br />Zone 1 <br />38,850 <br />14,700 <br />0 <br />Zone 2 <br />65,265 <br />24,695 <br />0 <br />Zone 3 <br />80,089 <br />171,618 <br />389,002 <br />Zone 4 <br />0 <br />0 <br />Soil to be placed <br />184,204 <br />211,013 <br />389,002 <br />Already Placed' <br />14,700 <br />0 <br />0 <br />Stockpiled' <br />138,949 <br />211,565 <br />392,463 <br />Soil Available2 <br />186,449 <br />211,565 <br />392,463 <br />Soil Balance' <br />2,245 <br />552 <br />1 3,461 <br />'From Topsoil/Subsoil Available table. <br />2Combintation of Already Placed and Stockpiled categories. <br />3Soil Available minus Soil to be placed. This shows that the plan can be accomplished with the soil on site, but it does <br />not mean that there will be soil left over. All soil will be used to reclaim according to this plan.. <br />'Includes the WFC Extra values shown on Map 2.05.4 -6 where applicable. <br />As can be seen from Table 2.05.4(2)(d) -3, there is sufficient topsoil and subsoil volume in the stockpiles <br />to complete the topsoil redistribution plan. Since stockpiled soil had rock fragments removed during <br />stripping, the recovery from stockpiles is treated as 100 %. The basic calculation of the topsoil required in <br />a given zone is: <br />Topsoil Needed = <br />Zone Area (ac) * 43,560 -'Y� * Soil Thickness (in) <br />121 /f� * 27 old s <br />The size of the stockpiles is determined via detailed surveys conducted on site. All soil thicknesses are <br />designed to the nearest inch, since this is the practical measurement limit for the scale of equipment used <br />at the New Horizon Mine. <br />12.2 North of BB Road/West 2700 Road <br />These lands include all lands north of BB Road and west of 2700 Road except for the 4.76 acres of prime <br />August 2013 (PR -08) 2.05.4(2)(d) -21 <br />