Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: NEW ELK <br />NPDES ID. No.: <br />Inspection Period: First Quarter 2014 <br />Inspection Date: <br />General Description or Reference to Site Plan: SF� vh c �� CU�c 8125('14 4 aw e57 Gs ✓� r� mR <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Ex Moderate Few Poor <br />2. Erosion forming Gullies: Excellen Moderate Few Poor <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes No <br />At the principal spillway inlet? Yes No <br />4. Erosion of the downstream toe of the embankment? Yes No <br />Cause of erosion can be attributed to: LI) Py'osjoil o ser It Fj � d'6� �� kt-4 <br />5. Is seepage occurring through the dam? Yes No—,,/ <br />Could this seepage cause potential instability? No Se2:,�2ees e O-4 <br />PRINICIPAL SPILLWAY <br />1. Is the principal spillway system in working order? Yes <br />2. Is the inlet free of debris and restrictive material? Yes <br />3. Is the discharge outlet free of restrictive material? Yes <br />4. Is erosion occurring at the discharge outlet? Yes <br />Evaluate the severity: Extensive Moderate <br />Page 1 of 2 <br />No <br />No <br />No <br />No <br />Just Starting None <br />