Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: NEW ELK <br />NPDES ID. No.: <br />Inspection Period: First Quarter 2014 <br />Inspection Date: .3-27- I y <br />General Description or Reference to Site Plan: Sec) vv rvJ Gcjd1 6,51', 4 1 oe5Co`14,a,f m4nt <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: <br />2. Erosion forming Gullies: <br />3. Is wave action causing erosion: <br />On the upstream embankment? <br />At the principal spillway inlet? <br />4e�11ent Moderate Few Poor <br />Moderate Few Poor <br />4. Erosion of the downstream toe of the embankment? <br />Cau se of erosion can be attributed to; <br />A, I050pdto,, �1•66a,,, <br />Yes No —)/ <br />Yes No <br />Yes No !/ <br />100 eras i6 1 o srr ve,) A- 4 /1' <br />5. Is seepage occurring through the dam? Yes No V-*" <br />Could this seepage cause potential instability? Itl J Sri RoQ9-e 6i5PY'yed Cz* 4-P <br />PRINICIPAL SPILLWAY <br />1. Is the principal spillway system in working order? <br />Yes_ <br />No <br />2. Is the inlet free of debris and restrictive material? <br />Yes <br />No <br />3. Is the discharge outlet free of restrictive material? <br />Yes <br />No <br />4. Is erosion occurring at the discharge outlet? <br />Yes <br />No <br />Evaluate the severity: Extensive <br />Moderate Just Starting <br />(No <br />Page 1 of 2 <br />