Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: NEW ELK <br />NPDES ID. No.: <br />Inspection Period: First Quarter 2014 <br />Inspection Date: 3---)7- JLJ <br />1 ��S�Uf� (�iPS�co�f4��lnaPei� <br />General Description or Reference to Site Plan: SeGI� h,dr(1 -' Gcr�C�'1 &1510 <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: E cellent Mod Few Poor <br />2. Erosion forming Gullies: Excel Moderate Few Poor <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes No�� <br />At the principal spillway inlet? Yes No <br />4. Erosion of the downstream toe of the embankment? Yes NLo <br />Cause of erosion can be attributed to: �c' PiUS Ian ohs er Y PC,' 11 rn,P <br />Uhf 0 141 <br />5. Is seepage occurring through the dam? Yes No l� <br />Could this seepage cause potential instability? A) SPpL21c c C&OJIVC -d A J4 hn^e <br />m <br />PRINICIPAL SPILLWAY <br />1. Is the principal spillway system in working order? <br />2. is the inlet free of debris and restrictive material? <br />3. Is the discharge outlet free of restrictive material? <br />4. Is erosion occurring at the discharge outlet? <br />Yes <br />Yes // <br />Yes L/ <br />Yes <br />Evaluate the severity: Extensive Moderate <br />Page 1 of 2 <br />Just Starting <br />No <br />No <br />No <br />No <br />