Laserfiche WebLink
March 27, 2014 <br />2.4 Placement and Compaction of Fill Materials <br />A minimal amount of material was placed on the fill this quarter. This material was placed between the <br />7600' and the 7625' elevations on the north east portion of the dump by Komatsu 830E -AC haul trucks. <br />The fill material was limited to 25' in height this quarter. After placement of the material, GPS equipped <br />dozers were used to slope the area assuring construction was consistent with the approved design. <br />The fill placement during this quarter was consistent with the approved design, and prudent <br />construction methods As fill material is placed above a previous dump level, the surface of the previous <br />dump is ripped with a D -10 dozer to prevent the formation of perched water tables. Photograph 5 <br />depicts the west facing slope of the fill in the area where the slope of the fill is at 3H:1V. <br />At the end of the first quarter of 2014, the north half of the dump was at the 7600' through 7630' levels. <br />On the south half of the fill was at the 7600' through the 7740'elevation. <br />Photograph 5: South Side Fill3H:1V Face Looking North (312612014) <br />5 <br />