Laserfiche WebLink
March 27, 2014 <br />Horse Gulch Fill Quarterly Inspection Report <br />Fourth First Quarter 2014 <br />Table of Conten <br />1.0 Introduction <br />2.0 Critical Construction Periods <br />2.1 <br />Removal of All Organic Material and Topsoil <br />2.2 <br />Placement of Underdrainage Systems <br />2.3 <br />Installation of Surface Drainage Systems <br />2.4 <br />Placement and Compaction of Fill Materials <br />2.5 <br />Revegetation <br />3.0 References <br />I certify that this report was prepared by me. <br />1 <br />`a <br />3 <br />3 <br />3 <br />3 <br />5 <br />6 <br />6 <br />10 00 `�ri <br />�er••s:C /i <br />Syr; �p,RIE <br />'O <br />° 43864 �e <br />Tonia Marie Perkins <br />CO PE <br />Mining Engineer <br />N AL <br />Trapper Mining, Inc. <br />1 <br />`a <br />3 <br />3 <br />3 <br />3 <br />5 <br />6 <br />6 <br />