My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-26_REVISION - C1981008 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-09-26_REVISION - C1981008 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:40 PM
Creation date
3/28/2014 7:33:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
9/26/2013
Doc Name
Permit Page Edits - Prime Farnland 2.06.6
Type & Sequence
PR8
Email Name
DAB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17w �mmppm- <br />The =• <br />UAI <br />The return of soil productivity on prime farmland will be based on whether the Irrigated Cropland <br />post mine land use is achieved. In order for the Prime Farmland Irrigated Cropland to be <br />considered successful, it must meet or exceed 100% of the production of the reference area <br />production within the 90% confidence interval. It must meet this standard over a three year <br />average. Considering that the Irrigated Cropland reference area is undisturbed prime farmland soils <br />on the same property (part of the same post mine fields), this should be more than sufficient to <br />demonstrate the return of prime farmland soil productivity <br />9.1 Revegetation Success Determination Procedures for Prime Farmland <br />Starting at least three years prior to bond release, data will be gathered on an annual basis to <br />determine average crop production for the prime farmland areas. An average of the 3 years total <br />production will be calculated and compared to the 3 year average reference area production. <br />Production success for the reclaimed prime farmland will be achieved if direct comparison of the <br />3 year average production equals or exceeds 100% of the reference area 3 year average <br />production. This complies with Rule 4.25.5(3)(d) for prime farmland, which takes precedence over <br />Rule 4.15.9 when prime farmland is involved. <br />If the 3 year average of the reclaimed area does not meet or exceed the 3 year average reference <br />area production, the field will be managed in the 4th year using the same procedures described in <br />the management plan of Subsection 5.7.1 for the final three years of bond liability period. <br />Production data will be collected as described above for that year. The new average will be <br />calculated from the crop production values determined for the three cropping years immediately <br />prior to the bond release application. If this 3 year average is equal to or exceeds (within the <br />confidence interval) the same 3 year average of the reference area production, then production <br />success is met. If this 3 year average does not meet the production of the reference area, the 5th <br />year is managed in the same way and the average production from at least three of the five years, <br />including the last three years immediately prior to bond release application is calculated and <br />compared to the reference area. This process would continue until the minimum 3 year average <br />August 2013 (PR -08) 2.06.6 -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.