Laserfiche WebLink
Zone 8 (2.83) - Topsoil: 38 inches of Mixed Topsoil over at least 18 inches of Bench 1 Surface Spoil. <br />Topsoil Stockpile #12 will be used to reclaim the last 3 cuts of the mining area and Pond 013, once the <br />area has been backfilled from Mount Nucla and the Bench 1 material has been placed. <br />August 2013 (PR -08) 2.05.4(2)(d) -36 <br />