stjotaHe and has acceptable in thefor reclamation. This change was approved and the replacement <br />work was completed. As of February, 2008, these reclaimed areas appear to be doing well and will meet <br />the bond release criteria. <br />As of June 2010, much of the area has obtained or is about to obtain Phase 2 bond release. <br />August 2013 (PR -08) 2.05.4(2)(d) -27 <br />