My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-26_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2013-09-26_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:40 PM
Creation date
3/28/2014 7:20:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
9/26/2013
Doc Name
Permit Page Edits - Revegetation 2.05.4(2)(e)
Type & Sequence
PR8
Email Name
DAB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 — Revegetation Methods - Reclaimed Irrigated Pastureland <br />A significant acreage of the revegetated areas will be returned to a postmining land use of <br />irrigated pasture including lands within the permit area which have not been disturbed, but <br />which have had irrigation water shut -off in order to better control and manage surface and <br />ground water within the mine area during operations. Map 2.05.4 -5 shows all Reclaimed <br />Irrigated Pasturelands as well as all other post -mine land uses. <br />4.1 Topsoil Replacement - General Comments <br />Topsoil replacement operations may be carried out during most of the year, the exception being <br />those periods when wet conditions would preclude handling of the topsoil materials. Prior to <br />replacement of topsoil, the graded spoil will be ripped to reduce compaction. Detailed topsoil <br />handling and replacement plans are provided in Section 2.05.4(2)(d), Topsoil (Redistribution). <br />August 2013 PR -08 2.05.4(2)(e) - 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.