Laserfiche WebLink
Exhibit L — Reclamation Costs <br />+ 1,357.59+ (50+ % failure) <br />$ 4,072.77+ Total reseeding costs <br />OTHER MISCELLANEOUS COSTS: <br />Mobilization and demobilization costs are based upon the Division's estimate of 8 <br />pieces of equipment at $125.00± per hour for 4.0± hours, or $4,000.00 ±. <br />Demolition of Structures: None. Building Permits for structures will be obtain <br />where required from the Weld County Building Department. <br />Please Note: The per unit cost values derived from previous RMS <br />determinations for heavy equipment, as applied to this exhibit, are included at <br />the back of this exhibit. Since there is no possibility of the applicant in fully <br />reproducing the Division's methods, utilizing similarities from past RMS <br />calculations is the most viable and accurate means available for the applicant <br />to derive reasonable estimates of per unit costs and should result in estimates <br />very reliable with that of the Division. <br />Summary of Reclamation Costs: <br />$ 33,212.71± Total Site Preparation Prior to Re- soiling. <br />$ 7,522.61± Total Re- soiling <br />$ 4,072.77+ Total Re- vegetation <br />$ 44,808.09± Sub -Total <br />$ 4,000.00± Mobilization and Demobilization Costs (8 pieces of equipment) <br />$ 48,808.09± Sub -Total <br />$ 8,834.27± RMS Indirect Costs @ 18.1 % of Total Reclamation Costs <br />$ 579642.36± Grand Total — Financial Warranty Amount <br />Varra Companies, Inc. Heintzelman Project RMS 1 12 Permit Application 6 <br />11 November 2008 <br />