Laserfiche WebLink
.. .. . ............... .... ..... <br />ROADAiLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description <br />Total <br />Cost/hour/unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr/fleet <br />Return Trip <br />Cost/hr/fleet <br />-Water Tanker, Z 500 Gal. <br />$45.35 <br />1 <br />$45.35 <br />$45.35 <br />Loading time (hours) = <br />2.00 <br />Unloading time (hours) = <br />2.00 <br />Subtotals = <br />4.60 <br />NA <br />Total roadable mob/demob cost **: <br />$27.21 <br />NA <br />one round trip, no haul rig <br />0.60 <br />Subtotals <br />$45.35 <br />$45.35 <br />. ........ . <br />. .............. .. . . ....... <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time: <br />Non- <br />Roadable <br />12.0 miles <br />Equipment <br />Haul time (hours) = <br />0.30 <br />Return time (hours) = <br />0.30 <br />Loading time (hours) = <br />2.00 <br />Unloading time (hours) = <br />2.00 <br />Subtotals = <br />4.60 <br />Nearest major city or town within project area region <br />Longmont <br />Total one-way, travel distance <br />12.0 miles <br />Roadable <br />Average travel speed <br />40.0 mph <br />:-quipment <br />0.30 <br />Total non-roadable mob/demob cost <br />$7,591.77 <br />0.30 <br />* two round trips wth haul ng <br />NA <br />Total roadable mob/demob cost **: <br />$27.21 <br />NA <br />one round trip, no haul rig <br />0.60 <br />.... .... . <br />......... . ...... ........ <br />.. . ..... .. <br />JOB TIME AND COST Total job time 9.20 hours <br />Total job cost $7,619 <br />.. ...... <br />