My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-26_PERMIT FILE - M2013064
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013064
>
2014-03-26_PERMIT FILE - M2013064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:25 PM
Creation date
3/27/2014 4:17:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013064
IBM Index Class Name
PERMIT FILE
Doc Date
3/26/2014
Doc Name
Second Adequacy Review Reply Comments
From
Varra Companies, Inc.
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. .. . ............... .... ..... <br />ROADAiLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description <br />Total <br />Cost/hour/unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr/fleet <br />Return Trip <br />Cost/hr/fleet <br />-Water Tanker, Z 500 Gal. <br />$45.35 <br />1 <br />$45.35 <br />$45.35 <br />Loading time (hours) = <br />2.00 <br />Unloading time (hours) = <br />2.00 <br />Subtotals = <br />4.60 <br />NA <br />Total roadable mob/demob cost **: <br />$27.21 <br />NA <br />one round trip, no haul rig <br />0.60 <br />Subtotals <br />$45.35 <br />$45.35 <br />. ........ . <br />. .............. .. . . ....... <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time: <br />Non- <br />Roadable <br />12.0 miles <br />Equipment <br />Haul time (hours) = <br />0.30 <br />Return time (hours) = <br />0.30 <br />Loading time (hours) = <br />2.00 <br />Unloading time (hours) = <br />2.00 <br />Subtotals = <br />4.60 <br />Nearest major city or town within project area region <br />Longmont <br />Total one-way, travel distance <br />12.0 miles <br />Roadable <br />Average travel speed <br />40.0 mph <br />:-quipment <br />0.30 <br />Total non-roadable mob/demob cost <br />$7,591.77 <br />0.30 <br />* two round trips wth haul ng <br />NA <br />Total roadable mob/demob cost **: <br />$27.21 <br />NA <br />one round trip, no haul rig <br />0.60 <br />.... .... . <br />......... . ...... ........ <br />.. . ..... .. <br />JOB TIME AND COST Total job time 9.20 hours <br />Total job cost $7,619 <br />.. ...... <br />
The URL can be used to link to this page
Your browser does not support the video tag.