My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-26_PERMIT FILE - M2013064
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013064
>
2014-03-26_PERMIT FILE - M2013064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:25 PM
Creation date
3/27/2014 4:17:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013064
IBM Index Class Name
PERMIT FILE
Doc Date
3/26/2014
Doc Name
Second Adequacy Review Reply Comments
From
Varra Companies, Inc.
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION <br />FORM <br />USED <br />FLEET <br />SIZE <br />TASK <br />HOURS <br />DIRECT <br />COST <br />001 <br />- Grading Pit Walls in Tract A <br />dozer <br />2 <br />198.2 <br />$78,602 <br />.002 <br />- Dewatering Tract A <br />pumping <br />1 1 <br />3,434.00 <br />$24,107 <br />003 <br />- Replacing Topsoil <br />scraper1 <br />2 <br />20.1 <br />$15,350• <br />004 <br />- Reveget?ation of Disturbed Areas <br />revege <br />1 <br />16.00 <br />$11,134 <br />005 <br />- Equipment Mobilization/Demobilization <br />mobilize <br />1 <br />9.2C <br />$7,619 <br />• 006 <br />- Replacement Pump <br />pumping <br />1 <br />0.1 <br />$20,528 <br />SUBTOTALS:1 <br />3,677.70 <br />$157,340 <br />includes inflation factor adjustment of: NA % TOTAL DIRECT COST' =I $157,340 <br />INDIRECT COSTS <br />TOTAL O & P = <br />$40,701 <br />OVERHEAD AND PROFIT - Liability insurance : <br />2.02 <br />% of direct <br />total = <br />$3,178 <br />Performance bond : <br />1.05 <br />% of direct <br />total = <br />$1,652 <br />Job superintendent: <br />386.50 <br />hrs " ... $/hr.• $52.10 <br />total = <br />$20,137 <br />Profit : <br />10.00 <br />% of direct <br />total = <br />$15,734 <br />' net working hours compnsing job <br />TOTAL O & P = <br />$40,701 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />CONTRACT AMOUNT (direct + 0 & P) = <br />$198,041 <br />Financial warranty processing (legal /related costs) : <br />0.00 <br />total $ <br />NA total = <br />$0 <br />Engineering work and /or contract/bid preparation : <br />NA <br />NA <br />NA total = <br />NA <br />Reclamation management and /or administration : <br />5.00 <br />% of cntr. <br />NA total = <br />$9,902 <br />CONTINGENCY - <br />NA' <br />NA <br />total = <br />NA <br />contingencies accounted for at task level TOTAL INDIRECT COST = $50,603 <br />TOTAL BOND AMOUNT (direct + indirect) _ $207,943 <br />
The URL can be used to link to this page
Your browser does not support the video tag.