Laserfiche WebLink
Task description: Road G <br />Western Sugar Reclamation <br />Site: Land Development Project <br />MOTOR GRADER WORK <br />Permit Action: Financial Warranty <br />Calculation <br />PROJECT IDENTIFICATION <br />Task #: 008 State: Colorado <br />Date: 6/27/2011 County: Weld <br />User: MAC <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14H <br />Ripper Attachment: <br />Cost Breakdown: <br />Permit/Job #: M2010049 <br />Abbreviation: None <br />Filename: M049 -008 <br />Horsepower: 215 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $128.74 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 4.60 acres <br />Source of estimated acreage: Exhibit D - Mining Plan <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />6.25 <br />Utilization <br />Ownership Cost/Hour: <br />$34.52 <br />NA <br />Operating Cost/Hour: <br />$13.93 <br />25 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />Width of blade overlap per pass: <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total Unit Cost/Hour: <br />$86.95 <br />Unadjusted Hourly Unit Production: <br />Total Fleet Cost/Hour: $128.74 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 4.60 acres <br />Source of estimated acreage: Exhibit D - Mining Plan <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />6.25 <br />mph <br />Selected Application: <br />Road maintenance (3 -9.5 mph) - 6.25 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade- Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />7.6515 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 4600 feet <br />Source <br />Altitude Adj: 1.00 <br />(CAT HB) <br />Job Efficiency: 0.90 <br />(1 sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />6.8864 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />6.8864 <br />acres/Hour <br />JOB TEWE AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />2.67 Hours <br />Unit cost: $12.63 per acre <br />Total job cost: <br />$232.00 <br />CIRCES Cost Estimating Software <br />