My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-26_PERMIT FILE - M2013064
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013064
>
2014-03-26_PERMIT FILE - M2013064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:25 PM
Creation date
3/27/2014 4:17:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013064
IBM Index Class Name
PERMIT FILE
Doc Date
3/26/2014
Doc Name
Second Adequacy Review Reply Comments
From
Varra Companies, Inc.
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Replacing Topsoil <br />Western Sugar Reclamation Permit Action: Financial Warranty <br />Site: Land Development Project Calculation Permit/Job #: M2010049 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado Abbreviation: None <br />Date: 6/20/2011 County: Weld Filename: M049 -003 <br />User: MAC <br />Agency or organization name: DRMS <br />• N , <br />HOURLY EQUIPMENT COSTShift basis: 1 per day , <br />I <br />- Scraper: <br />Cat 627G <br />- Dozer: <br />NA <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />('nct Rreakdnwn- Scraper Wnrk Team Sunnort Fauinment Maintenance Eauinment <br />Total work team cost/hour: $227.48 t <br />MATERIAL QUANTITIES ' <br />Initial volume: 9,849 CCY Swell factor: 1.000 <br />Loose volume: 9,849 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$48.66 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$140.14 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$227.48 ' <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />1 0 <br />0 <br />Group Subtotals: <br />Work: <br />$227.48 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $227.48 t <br />MATERIAL QUANTITIES ' <br />Initial volume: 9,849 CCY Swell factor: 1.000 <br />Loose volume: 9,849 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />1,600 lbs /LCY <br />Struck Volume: <br />15.70 <br />LCY <br />Material description: <br />Top Soil <br />Heaped Volume: <br />22.00 <br />LCY <br />Rated Payload: <br />48,000 pounds <br />Average Volume: <br />18.85 <br />LCY <br />Payload Capacity: <br />30.00 LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.