My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-26_PERMIT FILE - M2013064
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013064
>
2014-03-26_PERMIT FILE - M2013064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:25 PM
Creation date
3/27/2014 4:17:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013064
IBM Index Class Name
PERMIT FILE
Doc Date
3/26/2014
Doc Name
Second Adequacy Review Reply Comments
From
Varra Companies, Inc.
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZ$R WORK <br />Task description: Backfilling highwall <br />Western Sugar Reclamation Permit Action: Financial Warranty <br />Site: Land Development Project Calculation Peimit/Job #: M2010049 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 6/20/2011. County: Weld <br />User: MAC <br />Agency or organization name: < DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9R - 9SU (2005) <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />-Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None i <br />Filename: M049 -002 <br />Total unit Cost/Hour: $205.56 <br />Total Fleet Cost/Hour: $411.13 <br />MATERIAL QUANTITIES <br />Initial Volume: 69,259 <br />Swell factor: 1.000 <br />Loose volume: 69,259 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet. <br />Unadjusted hourly production: 2,110.5 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />30% <br />4,600 feet <br />lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator $kill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$49.19 <br />NA <br />Operating Cost /I /Hour: <br />$117.89 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $205.56 <br />Total Fleet Cost/Hour: $411.13 <br />MATERIAL QUANTITIES <br />Initial Volume: 69,259 <br />Swell factor: 1.000 <br />Loose volume: 69,259 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet. <br />Unadjusted hourly production: 2,110.5 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />30% <br />4,600 feet <br />lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator $kill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.