Laserfiche WebLink
III <br />EXISTING BAR GRAVITY SUPPORT OF THE RCP LATERAL SUPPORT OF THE RCP <br />,IOSr AT LOCATIONS AWAY FROM THE AT LOCATIONS AWAY FROM THE <br />WORK AREA AT THE PEDESTALS WORK AREA AT THE PEDESTALS <br />MAY NOT BE NECESSARY. AT MAY NOT BE NECESSARY. AT <br />CONTRACTOR'S OPTION, INSTALL CONTRACTOR'S OPTION, INSTALL <br />SHORING THIS AREA AM. SHORING THIS AREA ALSO. <br />X -BRACE <br />ELEVATION OF EXIST. PIPES & POTENTIAL TEMPORARY SUPPORTS, LOOKING EAST <br />i I /4' - 1,_D. <br />11QIE: CONNECT BEMIS 70 PIPE SUPPORT <br />* .,■ ;. JOISTS. BEAMS TO COLUMNS, h COLUMNS <br />TO FOUNDATIONS w MATERIALS & <br />METHODS APPROPRIATE TO THE <br />4 4 BEAU /COLUMN MATERIALS USED ON SITE <br />v 6x6 DIAG. KICKER w/ WEDGES CHORD. w/ ENGINEER BEFORE CONSTR <br />AT BEARING BLOCK. INSTALLED <br />.r FROM SIDES ONLY ,i COORDINATE PLACEMENT OF TEMPORARY <br />BEAR KICKER AGAINST MIN. 4' -0' LONG SECTION SHORING ELEMENTS WITH INSTALLATION OF <br />! OF 6x6 TIMBER SET ON ANGLE AND EMBEDDED t THE PERMANENT BEAM SUPPORT SYSTEM. <br />INTO NOTCH CUT INTO COMPETENT SOILS CONSISTENT WITH THE CONTRACTOR'S <br />CHOSEN MEANS/MERIODS FOR THE DIRE <br />SEQUENCE OF CONSTRUCTION. <br />TEMP. INSTALL VE <br />BEAM RE. PPORTS <br />6't OPOPPOSIE <br />O NOTE #3 TO COMPU <br />4 REMOVE & <br />FROM THE <br />TEMPORARY LOAD PATH <br />DIAL. S TO PASS BY NOTE RE SHORING <br />O <br />JOIST TOP CHORD f4 RE NOTE fM <br />W/0 CONTACT <br />STEP 1 — DIAG. KICKERS <br />I Io of II <br />STEP 2 — VERT. SUPPORT NEAR WORK AREA STEP 3 — VERT. SUPPORTS OPP. SIDE OF WORK AREA <br />TEMPORARY SHORING OPTION, AS VIEWED FROM ROAD <br />INSTALL <br />1. TEMPORARY DIAGONAL BRACES NEAR THE WORK AREA (AT PEDESTALS) <br />I.I. DEPD MM ON COORDINATION WITH HENDERSON SAFETY. INSTALL ADDITIONAL DIAGONAL BRACES AT JOIST <br />MIDSPAN AND QUARTER POINTS, AT 10' -0't ON CENTER. <br />2. INSTALL TEMPORARY CONCRETE FOUTING(S), APPROX. AS DIMENSIONED N M"ATION NEW <br />3. INSTALL TEMPORARY SUPPORT BEAMS, TIGHT TO UNDERSIDE OF EXIST. 8x6 WOOD PIPE SUPPORT JOISTS, <br />WITHOUT DISTURBING THE EXISTING JOIST X- BRACES <br />4. INSTALL TEMPORARY SHORING COLUMNS FROM BEAM TO TEMPORARY CONCRETE FOOTIN(S). <br />5. REPEAT STEPS 2, 3 R 4 AT THE REMAINING PORTIONS OF THE PIPE IN THE WORK AREA. 6. REPEAT STEPS 2, 3 d 4 AT THE OPPOSITE SIDE OF THE PPE IN THE WORK AREA <br />fKM& 1/4' - 1' -0' <br />1. THE TEMPORARY SHORING S MENDED TO PROVIDE LIFE SAFETY FOR THE CONTRACTOR'S PERSONNEL WHO MUST WORK UNDER THE <br />PEE DURING INSTALLATION OF THE SUPPORT BRACKETS WHICH WILL SUPPORT THE PERMANENT BEAM SUPPORT SYSTEM. <br />2. THE SHORING ILLUSTRATED IN THIS DRAWING IS ONLY ONE OF MANY POSS13LE SHORING SYSTEMS, TO BE DETERMINED AND USED AT <br />THE DISCRETION OF THE CONTRACTOR AND HENDERSON SAFETY. <br />3. VERTICAL SUPPORT OF CONCRETE PIPE, IN PLACE WHILE PERSONNEL ARE WORKING UNDER THE PIPE FOR EXTENDED PERIODS, IS TO <br />OCCUR ONLY FROM CONCRETE PADS PLACED ON NATIVE SOTS. <br />3.1. THESE SHORING FOOTINGS MAY BE 12' MIN. THICKNESS, 3' -0' x 3' -0' CONCRETE, REINFORCED w/ 15 AT W O.C. LW. TOP a <br />BOTTOM, CAST ON NATIVE SOIL/ROCK OR OTHER GBDTECH APPROVED SUBGRADE w/ MIN. 2,000 PSF BEARING CAPACITY. <br />3.1. ULTRA TEMPORARY 'FOOTINGS' MAY BE BxB OR SOIL HEAVY TIMBER MIN. 4' -0' LONG, LAID FIAT IN TEMPORARY GRADE CUTS. <br />THESE ARE INTENDED TO PROVIDE LIMITED SUPPORT TO THE PIPE WHILE WORKERS ARE IN THE VICTIM OF THE DAMAGED JOISTS <br />AND DIGGING THROUGH TAILS TO REACH NATIVE GRADE COORDINATE PLACEMENT' TO AVOID INTERFEHENCE/INTFRACTION WITH THE <br />CONCRETE FOOTINGS AND FUTURE BEAMS. <br />4. TEMPORARY SHORING BEAMS. w/ B' -0- MAX. SPAN BETWEEN TEMPORARY COLUMNS, MAY BE EITHER W403 STEEL OR Bx8 HEAVY <br />TIMBER DOUG -FIR -LARCH #2 GRADE, IN THE SYSTEM ILLUSTRATED ON THIS DRAWING. <br />5. TEMPORARY SHORING COLUMNS MAY BE: <br />3' O.D. 11 Gil STEEL SCREW JACK UP TO W-O' TALL. CAPACITY 13,200 LB. <br />64 HEAVY TIMBER LIP To 10' -0' TALL CAPACITY 12,100 LB. <br />3 1/2' O.D. SCH. 40 PPE SCREW JACK UP TO 12' -0- TAIL. CAPACITY 21,600 LB. <br />6x8 HEAVY TIMOR UP TO 16' -W TALL. CAPACITY 20.400 I.B. <br />OTHER TYPES OF SHORING COLUMNS AS DETERMINED BY THE CONTRACTOR. <br />6. EMPTY 36.0 RCP IS ESTIMATED AT 630 LB./FT. TATS IN A FULL PIPE IS ESTIMATED AT 700 LB./FT. <br />RECEIVED <br />MAR 2 7 2014 <br />Division of Raclamatlon, <br />Mining & Safety <br />DWG. NO. <br />REFERENCE DRAWINGS <br />DESCRIPTION OF REVISION <br />ISSUED FOR BID <br />DATE <br />3 -11 -14 <br />BY <br />JLK <br />APP BY <br />VENTILATION <br />MECHANICAL <br />ENGR: JLK <br />DRAWN BY: JP <br />2 -28 -14 <br />2 -28 -14 <br />HENDERSON OPERATIONS <br />-' Climax Molybdenum <br />A Freeport-McMoRan Company <br />EMPIRE IPARSHALL, COLORADO <br />303- 569-3221 <br />HENDERSON MILL <br />TAILINGS DROP LINE <br />TEMPORARY SHORING <br />STRUCTURAL <br />CHECKED BY: JCB <br />2 -28 -14 <br />ELECTRICAL <br />APPROVED BY:° <br />PIPING <br />APPROVED BY: <br />SCALE: AS NOTED <br />OTHER APP BY: <br />PROJ. NO. 13024 SHT S5.0 REV. <br />