My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-27_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2014-03-27_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:41:28 PM
Creation date
3/27/2014 3:47:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
3/27/2014
Doc Name
Tailing Deliver line Structural Support Refurbishment and Drop Tower 15 & 16 Removal - Proposed TR22
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR22
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEDESTAL <br />12 +/— YARDS <br />APPROXIMATE BACKFILL PROFILE <br />AFTER CONSTRUCTION <br />—SEE GENERAL NOTES <br />14 ELEVATED PIPE, TOWER #14 <br />i2.71 S2.7 1/819 = 1' -0„ <br />NO • ALL EXCAVATION QUANTITIES <br />LISTED ARE APPROXIMATE, BASED <br />ON INTERPRETATION OF EXISTING <br />GRADE IN PHOTOGRAPHS — NOT <br />SURVEYED TOPOGRAPHIC STUDIES. <br />DWG. NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY APP BY VENTILATION ENGR: JLK 2 -28 -14 HENDERSON MILL <br />ISSUED FOR BID WALK 2 -28 -14 JLK MECHANICAL DRAWN BY: JP 2 -28 -14 HENDERSON OPERATIONS TAILINGS DROP LINE <br />STRUCTURAL CHECKED BY: JCB 2 -28 -14 � Climax Molybdenum <br />ELECTRICAL APPROVED BY: �AFreeport- McMoRanCompany EXCAVATION ELEVATIONS <br />PIPING APPROVED BY: EMPIRE / PARSHALL, COLORADO <br />SCALE: AS NOTED OTHER APP BY: 30330-3221 PROJ. NO. 13024 SHT S2.7 REV. <br />I <br />- - - -- - <br />-/-'V - - - <br />- -- <br />; <br />APPROXIMATE EXTENT OF <br />SOIL <br />TO BE REMOVED <br />- o <br />-___ <br />I- <br />,, %j i j <br />------- -- <br />f <br />. �'% •, ; % %,! % %:'% " NEW <br />Vic. Z�F';• •' fi''; ', *" , %; ;' %; , %' 100 <br />FDN NEAR TOWER <br />+/— YARDS <br />APPROXIMATE <br />EXISTING GRADE <br />;,•::..'.a" <br />i.ti <br />„ <br />APPROXIMATE BACKFILL PROFILE <br />AFTER CONSTRUCTION <br />—SEE GENERAL NOTES <br />14 ELEVATED PIPE, TOWER #14 <br />i2.71 S2.7 1/819 = 1' -0„ <br />NO • ALL EXCAVATION QUANTITIES <br />LISTED ARE APPROXIMATE, BASED <br />ON INTERPRETATION OF EXISTING <br />GRADE IN PHOTOGRAPHS — NOT <br />SURVEYED TOPOGRAPHIC STUDIES. <br />DWG. NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY APP BY VENTILATION ENGR: JLK 2 -28 -14 HENDERSON MILL <br />ISSUED FOR BID WALK 2 -28 -14 JLK MECHANICAL DRAWN BY: JP 2 -28 -14 HENDERSON OPERATIONS TAILINGS DROP LINE <br />STRUCTURAL CHECKED BY: JCB 2 -28 -14 � Climax Molybdenum <br />ELECTRICAL APPROVED BY: �AFreeport- McMoRanCompany EXCAVATION ELEVATIONS <br />PIPING APPROVED BY: EMPIRE / PARSHALL, COLORADO <br />SCALE: AS NOTED OTHER APP BY: 30330-3221 PROJ. NO. 13024 SHT S2.7 REV. <br />
The URL can be used to link to this page
Your browser does not support the video tag.