Laserfiche WebLink
APPROXIMATE BACKFILL PROFILE <br />AFTER CONSTRUCTION <br />—SEE GENERAL NOTES <br />� (-1-6- <br />ELEVATED PIPE, TOWER #10 <br />S2.51 S2.5 <br />PEDESTAL <br />4 r] 1 / VADnC <br />NEW FDN NEAR TOWER <br />65 +/— YARDS <br />1/81, = 1' -0" <br />r ELEVATED PIPE, TOWER #11 <br />S2.5 S2.5 <br />NOTE: ALL EXCAVATION QUANTITIES <br />LISTED ARE APPROXIMATE, BASED <br />ON INTERPRETATION OF EXISTING <br />GRADE IN PHOTOGRAPHS — NOT <br />SURVEYED TOPOGRAPHIC STUDIES. <br />DWG. NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY APP BY VENTILATION ENGR: JLK 2 -28 -14 HENDERSON MILL <br />ISSUED FOR BID WALK 2 -28 -14 JLK MECHANICAL DRAWN BY: JP 2 -2714 HENDERSON OPERATIONS TAILINGS DROP LINE <br />STRUCTURAL CHECKED BY: JCB 2 -28 -14 - Climax Molybdenum <br />ELECTRICAL APPROVED BY: .AFreeport- McMoRanCompany EXCAVATION ELEVATIONS <br />PIPING APPROVED BY: EMPIRE / PARSHALL, COLORADO <br />SCALE: AS NOTED OTHER APP BY: 303- 569-3221 PROJ. NO. 13024 SHT S2.5 REV. <br />PEDESTAL <br />12 +/— YARDS <br />— -- — - <br />- -- - - -- — -- <br />� � ��������`�� ������' ���' ��' ������' ��������������� , , <br />, > <br />� <br />APPROXIMATE <br />EXTENT OF <br />_mss. <br />� ,���� <br />`���������������������� <br />•; <br />SOIL TO <br />BE REMOVED <br />TRENCH <br />BEAM <br />0I 32 +/— <br />YARDS <br />',', <br />NEW FDN NEAR TOWER <br />APPROXIMATE <br />80 +/— <br />YARDS <br />EXISTING GRADE <br />�_ <br />APPROXIMATE BACKFILL PROFILE <br />AFTER CONSTRUCTION <br />—SEE GENERAL NOTES <br />� (-1-6- <br />ELEVATED PIPE, TOWER #10 <br />S2.51 S2.5 <br />PEDESTAL <br />4 r] 1 / VADnC <br />NEW FDN NEAR TOWER <br />65 +/— YARDS <br />1/81, = 1' -0" <br />r ELEVATED PIPE, TOWER #11 <br />S2.5 S2.5 <br />NOTE: ALL EXCAVATION QUANTITIES <br />LISTED ARE APPROXIMATE, BASED <br />ON INTERPRETATION OF EXISTING <br />GRADE IN PHOTOGRAPHS — NOT <br />SURVEYED TOPOGRAPHIC STUDIES. <br />DWG. NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY APP BY VENTILATION ENGR: JLK 2 -28 -14 HENDERSON MILL <br />ISSUED FOR BID WALK 2 -28 -14 JLK MECHANICAL DRAWN BY: JP 2 -2714 HENDERSON OPERATIONS TAILINGS DROP LINE <br />STRUCTURAL CHECKED BY: JCB 2 -28 -14 - Climax Molybdenum <br />ELECTRICAL APPROVED BY: .AFreeport- McMoRanCompany EXCAVATION ELEVATIONS <br />PIPING APPROVED BY: EMPIRE / PARSHALL, COLORADO <br />SCALE: AS NOTED OTHER APP BY: 303- 569-3221 PROJ. NO. 13024 SHT S2.5 REV. <br />